Intelligent Group
Demand Response Auto-Shed

Earn revenue from your existing controls

Madison Avenue Towerparticipates in ConEd's grid-relief programs. When ConEd calls a shed event, our pre-cool → coast → restore playbook executes through G36-compliant setpoint moves — earning capacity payments while contributing to LEED EAc5 (Demand Response, 1–2 points) and reducing peak-coincident emissions on the dirtier marginal-grid hours.

Enrolled Capacity
220kW
1 program(s)
Events Completed (YTD)
5
3,726 kWh shed total
Revenue (YTD)
$23,526
$19,800 capacity + $3,726 performance
LEED EAc5
Eligible
continuous participation evidence ready
CSRP
Enrolled
ConEd Commercial System Relief Program

Day-ahead network-relief program. 21-hr advance notice, May–Sep. Predictable revenue.

Capacity
220 kW
Capacity Rate
$18/kW·mo
Performance
$1.00/kWh
DLRP
Available
ConEd Distribution Load Relief Program

Same-day distribution-relief program. Higher rate, 2-hr notice. Strong fit for a building with G36-conformant Trim & Respond.

Capacity
Capacity Rate
$25/kW·mo
Performance
$1.00/kWh
Add ~220 kW DLRP enrollment → +$66K/yr capacity revenue

Auto-shed playbook

Standard 4-hour event execution — three phases driven by setpoint nudges, no occupant-visible disruption.

1Pre-cool
−60 min before event
  • Drop zone setpoints by 1.5°F
  • Open OA dampers to 60% (free cooling)
  • Charge thermal mass of building
2Coast (Shed)
0 → +4 hrs
  • Raise setpoints by 2°F (peak hours)
  • Trim chiller demand 25–30%
  • Lighting dim 20% (non-critical zones)
3Restore
event end + 60 min
  • Step setpoints back to occupied schedule
  • Validate zone recovery within 30 min
  • Log shed performance to ConEd portal
All setpoint writes proceed through the 4-layer safety model (dry-run → dual approval if outside guardrails → BACnet priority 13 → auto-revert) — production track, not active in this demo.

Historic shed events

Past performance feeds LEED EAc5 evidence and ConEd settlement.

DateProgramDurationkW ShedkWh ShedComfort ΔPayment
May 8, 2025Test event1 hr210210+0.2°F peak zone drift$0
Sep 4, 2024CSRP4 hr215860+0.6°F peak zone drift$4,820
Aug 21, 2024CSRP3 hr198594+0.4°F peak zone drift$4,554
Aug 7, 2024CSRP4 hr222888+0.5°F peak zone drift$4,848
Jul 18, 2024CSRP4 hr205820+0.7°F peak zone drift$4,780
Jun 26, 2024CSRP3 hr188564+0.3°F peak zone drift$4,524
ConEd CSRP rates per 2024 program tariff. DLRP rates may vary by network. Performance payments capped at metered shed × tariff rate per ConEd settlement rules. Setpoint write-back is gated behind the 4-layer safety model — production track only.